SP Group calls for tenders to build charging grid for electric vehicles
30 charging points to be up in six months, and 500 by 2020. Charging small car to take as little as 30 minutes
DeeperDive is a beta AI feature. Refer to full articles for the facts.
Singapore
DRIVE your electric vehicle (EV) to the mall and leave with a fully-charged battery in the time it takes to grab a leisurely coffee.
This is one premise behind SP Group's intention to build the largest public EV charging network in Singapore by the end of the year.
Copyright SPH Media. All rights reserved.
TRENDING NOW
Shelving S$5 billion office redevelopment plan proved ‘wise’ as geopolitical risks mount: OCBC chairman
Eurokars Group introduces rental car franchises Enterprise Rent-A-Car, National Car Rental, and Alamo to Singapore
20 photos that show how dramatically Singapore has changed in two decades
Singapore ’s key exports up 15.3% in March from electronics surge, exceeding forecasts