Rotary Engineering bags S$140m contract to build new tank terminal in Singapore

Angela Tan
Published Wed, Apr 26, 2017 · 12:31 AM
Share this article.

ROTARY Engineering has won a S$140 million contract from Jurong Port Tank Terminals to build a new tank terminal in Singapore.

The job scope involves the construction of a tank farm with 19 tanks for clean petroleum products storage, pump stations, valve manifolds, firefighting system, slop and waste water system, utilities, buildings, jetty topsides, and interconnecting pipeline from Jurong Port Tank Terminal to Oiltanking's tank terminal.

The new terminal, which sits on 16 hectares of land, is located directly opposite Singapore's Jurong Island petrochemical hub, and will be connected to it via pipelines.

The new liquid bulk terminal will have an initial capacity of 232,000 cubic metres, and the potential to add another 230,000 cubic metres. It will be supported by jetties with a draft of 16 meters, capable of berthing vessels up to 120,000 deadweight tonnage.

The project is a joint venture between Jurong Port Singapore Holding and Oiltanking Investment Holdings.

BT is now on Telegram!

For daily updates on weekdays and specially selected content for the weekend. Subscribe to  t.me/BizTimes

Companies & Markets

SUPPORT SOUTH-EAST ASIA'S LEADING FINANCIAL DAILY

Get the latest coverage and full access to all BT premium content.

SUBSCRIBE NOW

Browse corporate subscription here