3 possible causes for Tuesday's train breakdown; investigations ongoing
SINGAPORE - SMRT and the Land Transport Authority (LTA) have identified three possible causes for the power trips on Tuesday evening, which eventually led to a shutdown of the North-South and East-West lines for over two hours during the evening peak period.
After doing a walk through the tunnels, engineers found that the insulation on two power cables along the North-South line were damaged.
For more read here
Share with us your feedback on BT's products and services