3 possible causes for Tuesday's train breakdown; investigations ongoing

Published Wed, Jul 8, 2015 · 06:33 AM

    DeeperDive is a beta AI feature. Refer to full articles for the facts.

    SINGAPORE - SMRT and the Land Transport Authority (LTA) have identified three possible causes for the power trips on Tuesday evening, which eventually led to a shutdown of the North-South and East-West lines for over two hours during the evening peak period.

    After doing a walk through the tunnels, engineers found that the insulation on two power cables along the North-South line were damaged.

    For more read here

    Copyright SPH Media. All rights reserved.